Marine Survey Checklist (On Blocks, Indoor Storage)
This checklist is designed for a strategic condition reassessment of Lucky Enough (2008 Regal 2565) while the boat is still in indoor storage up on blocks in mid April. It focuses on structural integrity, known risk areas, and practical system checks that can be done without a sea trial.
Limitations while on blocks:
You can inspect and test many items with shore power and batteries, but you cannot confirm performance under load such as cooling under power, WOT RPM, vibration underway, handling, trim response underway, and real-world shifting performance.
If possible, follow this survey with a short post-launch sea trial check.
Print mode starts each major section on a new page.
Survey Date: ____________________________________
Location: ____________________________________
Surveyor: ____________________________________
Boat: Lucky Enough (2008 Regal 2565)
Engine / Drive: MerCruiser 5.0 MPI + Bravo III
Hours: ____________________________________
1) Survey Basics and Documentation
Notes
2) Hull, Bottom, and Structural
2.1 Hull Exterior and Bottom
2.2 Moisture and Percussion Testing
2.3 Deck, Cockpit, and Superstructure
Notes
3) Through-Hulls, Seacocks, and Bonding
Notes
4) Sterndrive and Running Gear (Bravo III Focus)
Strategic note: If bellows and gimbal bearing service history is old or unclear, this should be treated as a known preventive maintenance risk item.
Notes
5) Engine and Mechanical (MerCruiser 5.0 MPI Focus)
5.1 Visual and Static Checks
5.2 Manifolds and Risers
5.3 Optional Mechanical Add-Ons
Notes
6) Fuel System
Notes
7) Electrical (DC and AC)
7.1 Batteries and DC
7.2 Shore Power and AC
7.3 Safety Devices
Notes
8) Plumbing, Water, and Head
Winterized note: If the plumbing system is winterized, testing may be limited to visual inspection unless you intentionally de-winterize for survey purposes.
Notes
9) Bilge, Pumps, and Drainage
Notes
10) Steering, Controls, and Helm
Notes
11) Cabin, Interior, HVAC, and Shower Sump
11.1 Cabin and Interior
11.2 Air Conditioning / Heater Unit
11.3 Shower Sump / Shower Bilge Pump Box
Notes
12) Ground Tackle and Safety Gear
Notes
13) Findings Summary and Action Plan
Use this section to turn the survey into an action plan for the season.
Must Do Now
Smart Preventive Items
Nice to Have / Monitor
General Notes
14) Post-Launch Sea Trial Follow-Up
Notes
Designed as a strategic condition review checklist for Lucky Enough while on blocks, with a follow-up section for post-launch validation.